Sagot :
(a) The work done on the rock by upward net force is 77.44 J.
(b) The maximum height reached by the block is 31.61 m.
Work done to accelerate the rock to the given height
The work done on the rock is calculated as follows;
W = Fd
W = 242 x 0.32
W = 77.44 J
Maximum height reached by the rock from the launch point
The maximum height reached by the block is calculated as follows;
W = mgh
77.44 = 0.25 x 9.8 x h
h = (77.44)/(2.45)
h = 31.61 m
Learn more about work done here: https://brainly.com/question/8119756
#SPJ2