Answer:
Here is a generic way to set up this type of algebra problem.
d = total amount of dirt at the site (tons)
r = rate or removal (tons/hr)
t = time it takes to remove all of the dirt (hr)
d = rt
The total amount of dirt equals the removal rate times hours spent removing all the dirt.
Since you want to solve for t, divide both sides by r
t = d/r